TxDOT loss gap analysis: how far off the winning bid you were, and why

Not every loss is the same

A loss by 15% is a structural pricing problem. A loss by 2% is one or two line items priced wrong. This tool tells you which one you're looking at.

Three ways to see why you lost

Loading company and geography lists…

Location - USA · Texas

Close loss radar: bids you nearly won

Not all losses are equal. A contractor who lost by 15% has a structural cost competitiveness problem on that project type. A contractor who lost by 2% had a pricing error on one or two line items. This feature identifies the close losses — defined as bids where the contractor's total was within 5% of the winner — and presents them as recoverable opportunities rather than defeats.

Total bids

24

Won

1 (4.20%)

Lost

23 (95.80%)

Revenue at stake

$2,231,135,864.91

Near miss

2 projects

$190,244,046.04

at stake

Lost by under 5%

Moderate

10 projects

$1,029,559,289.45

at stake

Lost by 6–20%

Structural

11 projects

$1,011,332,529.42

at stake

Lost by over 20%

2024-09-11 to 2026-09-11

Lost bids - Near miss (Top 5)

CSJProjectYour bidWinner bidGap %Dollar gapWinning vendorSwing itemRepricing simulation
0027-08-147UA 90: FM 359 TO W of SH 99$49,951,826.49$48,831,300.512.30%$1,120,525.98SER CONSTRUCTION PARTNERS, LLCMultiple items contributed
0135-03-046US 380 W of BRIDGE FARMER to 4TH ST$147,971,439.03$141,412,745.534.60%$6,558,693.50WEBBER, LLCCONC PVMT (CPCD) (10") — $4,471,425 gapIf you had priced CONC PVMT (CPCD) (10") at the winner's unit price, your total would have been $143,500,014 — above the winner's bid.

Want every close loss on your next bid flagged before it's a loss?Request POC access

Lost bids - Moderate (Top 5)

CSJProjectYour bidWinner bidGap %Dollar gapWinning vendorSwing itemRepricing simulation
0034-01-130US 83/84 Y INTERCHANGE$76,964,481.94$72,482,832.006.20%$4,481,649.94JAMES CONSTRUCTION GROUP, LLCRETAINING WALL (MSE) — $3,617,005 gapIf you had priced RETAINING WALL (MSE) at the winner's unit price, your total would have been $73,347,477 — above the winner's bid.
3510-04-066SH 99 SB FR, Cinco Ranch Bl to Bay Hill$21,656,182.27$19,505,917.9911.00%$2,150,264.28HARPER BROTHERS CONSTRUCTION LLCPREPARING ROW — $1,931,294 gapIf you had priced PREPARING ROW at the winner's unit price, your total would have been $19,724,888 — above the winner's bid.
3510-05-047SH 99, IH 10W to West Rd (Seg E)$134,004,995.37$119,970,903.3611.70%$14,034,092.01SER CONSTRUCTION PARTNERS, LLCPREPARING ROW — $8,105,601 gapIf you had priced PREPARING ROW at the winner's unit price, your total would have been $125,899,394 — above the winner's bid.
2230-01-020FM 1560: 2230-01-020; WNF$108,247,071.10$96,535,029.7112.10%$11,712,041.39SER CONSTRUCTION PARTNERS, LLCPREPARING ROW — $7,248,001 gapIf you had priced PREPARING ROW at the winner's unit price, your total would have been $100,999,070 — above the winner's bid.
0024-07-059US 90: 0024-07-059; WF$141,899,614.79$123,992,265.8014.40%$17,907,348.99JORDAN FOSTER CONSTRUCTION, LLCPREPARING ROW — $11,062,593 gapIf you had priced PREPARING ROW at the winner's unit price, your total would have been $130,837,021 — above the winner's bid.

Want every close loss on your next bid flagged before it's a loss?Request POC access

Lost bids - Structural (Top 5)

CSJProjectYour bidWinner bidGap %Dollar gapWinning vendorSwing itemRepricing simulation
0047-18-088US 75 Segment 4$175,957,115.93$145,430,024.2621.00%$30,527,091.67INDUS ROAD & BRIDGE, INC.Multiple items contributed
0081-03-047US 377 FROM SOUTH OF FM 1171 TO CRAWFORD$135,215,128.74$111,363,901.0021.40%$23,851,227.74WEBBER, LLCCONC PVMT (CRCP) (12") — $14,199,650 gapIf you had priced CONC PVMT (CRCP) (12") at the winner's unit price, your total would have been $121,015,479 — above the winner's bid.
0018-06-1850018-06, IH35 DIRECT CONNECTORS #3#4&#6$85,984,574.02$69,849,999.5023.10%$16,134,574.52URBAN INFRACONSTRUCTION LLCPREPARING ROW — $7,332,000 gapIf you had priced PREPARING ROW at the winner's unit price, your total would have been $78,652,574 — above the winner's bid.
0088-02-062US 59 Goliad San Antonio River Bridge$39,078,124.62$31,574,353.1623.80%$7,503,771.46HUNTER INDUSTRIES, LTD.RETAINING WALL (MSE) — $4,319,170 gapIf you had priced RETAINING WALL (MSE) at the winner's unit price, your total would have been $34,758,955 — above the winner's bid.
1502-01-031SL 88 3C (MPO 4021.3C) -2.$276,846,374.80$221,640,502.2224.90%$55,205,872.58WILLIAMS BROTHERS CONSTRUCTION CO., INC.Multiple items contributed

Want every close loss on your next bid flagged before it's a loss?Request POC access

Recurring competitors — win rate and typical price

For every positive-gap lost bid in the selected window, this analysis zones the loss (near miss under 5%, moderate 5–20%, structural over 20%), then counts how often each competitor beat you in that zone and sums their winning bid totals as revenue at stake. Use the three tables to prioritize who takes work from you most often in each gap band.

Lost bids with winner

23

Distinct competitors

16

Head-to-head wins against you

23

Revenue at stake

$2,231,135,864.91

2024-09-11 to 2026-09-11

Recurring competitors — Near miss (Top 5)

Lost by under 5%

CompetitorWins vs ZACHRYRevenue at stake
SER CONSTRUCTION PARTNERS, LLC1$48,831,300.51
WEBBER, LLC1$141,412,745.53

Want every recurring competitor flagged before your next bid?Request POC access

Recurring competitors — Moderate (Top 5)

Lost by 6–20%

CompetitorWins vs ZACHRYRevenue at stake
JORDAN FOSTER CONSTRUCTION, LLC2$182,550,824.66
SER CONSTRUCTION PARTNERS, LLC2$216,505,933.07
ANDERSON COLUMBIA CO., INC.1$178,365,453.35
HARPER BROTHERS CONSTRUCTION LLC1$19,505,917.99
HIGHWAY 19 CONSTRUCTION LLC1$63,703,073.56

Want every recurring competitor flagged before your next bid?Request POC access

Recurring competitors — Structural (Top 5)

Lost by over 20%

CompetitorWins vs ZACHRYRevenue at stake
WILLIAMS BROTHERS CONSTRUCTION CO., INC.2$443,120,921.78
COPASA INC1$21,288,201.98
HARPER BROTHERS CONSTRUCTION LLC1$74,036,474.93
HUNTER INDUSTRIES, LTD.1$31,574,353.16
INDUS ROAD & BRIDGE, INC.1$145,430,024.26

Want every recurring competitor flagged before your next bid?Request POC access

Your consistently overpriced items on lost bids

Across all lost bids, certain bid items appear repeatedly as gap drivers. These are not one-off pricing decisions, they are estimating assumptions baked into your process, showing up on every project where that item appears. Identifying these items gives you a short list of things to investigate before the next bid, rather than a generalized instruction to "price more competitively."

Lost bids analysed

23

Items with positive gap

1768

Systematic patterns

276

Total positive gap

$621,639,784.00

Items worth understanding before your next similar project — not a ranked worst-items list.

2024-09-11 to 2026-09-11

Overpriced items (Top 5)

Bid itemDescriptionLost bidsGap sharePatternYour avg unitWinner avgAvg gap %Total $ gap
100-7002PREPARING ROW (100-7002)1989.50%SYSTEMATIC$89,643.48$28,147.53218.50%$112,927,971.00
500-7001MOBILIZATION (500-7001)2095.00%SYSTEMATIC$11,623,684.21$9,281,551.8925.20%$44,500,514.00
502-7001BARRICADES, SIGNS AND TRAFFIC HANDLING (502-7001)2085.00%SYSTEMATIC$52,184.74$14,137.70269.10%$28,847,393.00
423-7001RETAINING WALL (MSE) (423-7001)1457.10%SPORADIC$103.94$72.5043.40%$23,428,927.00
100-6002PREPARING ROW (100-6002)2100.00%SPORADIC$117,000.00$43,000.00172.10%$19,613,190.00

Want your systematic overpricing patterns flagged automatically before your next bid?Request POC access

Frequently asked questions

What is TxDOT bid loss gap analysis?
It's an analysis of your lost TxDOT bids that shows how far off the winning price you were, broken down to the bid item level, so you can tell whether a loss was a structural pricing problem or a single misplaced number.
What counts as a "close loss"?
A bid where your total came within a set threshold, typically 5%, of the winning bid. Close losses are treated as recoverable opportunities, since they usually trace back to one or two specific bid items rather than a structural pricing gap.
Are competitors really underbidding, or is something else going on?
Usually something else. Most winning bids come in within 3-6% of the engineer's estimate, and a competitor's advantage on specific items is typically structural — plant ownership, volume purchasing, self-perform capability — not irrational underpricing.
How is "gap to winner" calculated?
It's the percentage and dollar difference between your total bid and the winning bid, on the project overall and broken down by the specific bid items driving that difference.
What is a "swing item"?
The single bid item responsible for the largest share of the gap between your bid and the winner's, on a given project — the item that would have changed the outcome if priced differently.
What is recurring competitors analysis?
For every positive-gap lost TxDOT bid in the selected window, the analysis zones the loss (near miss under 5%, moderate 5–20%, structural over 20%), then counts how often each competitor beat you in that zone and sums their winning bid totals as revenue at stake — a vendor-level rollup complementary to Close Loss Radar's project-level view.
What does it mean if a bid item shows up as a "systematic" overpricing pattern?
It means that item is priced above the winner's average across many lost bids, not just once, indicating a baked-in estimating assumption worth revisiting before your next bid, rather than a one-time pricing error.
Can I filter loss analysis by district or county?
Yes. State and county filters narrow results to your local competitive market, since win rates and gaps vary meaningfully by district.
How far back does the loss gap data go?
Up to 24 months by default, adjustable to a shorter window for more recent results only.
Is Loss Gap Analysis free to use?
Yes, available now as a free tool, no account required.