What winning bidders charged for 400-6005

$109
Median price from 8 winning bids (half came in below it)
From 8 Texas lettings at 290–17997 CY over 24 months.

Contractors who bid Item 400-6005

Price at a contractor's lowest and you have beaten them on this item. Price at their median and it is a coin flip. In price range, a short bar means they price this item consistently, a long one means it changes job to job.

Contractor
Bids
Price range
Lowest
Median
Highest
MC2 CIVIL, LLC
1
$50
$50
$50
C. E. BARKER, LTD.
1
$53
$53
$53
ENVIRONMENTAL ALLIES, INC.
1
$75
$75
$75
FORDE CONSTRUCTION COMPANY, INC.
1
$85
$85
$85
JAMES CONSTRUCTION GROUP, LLC
3
$93
$198
$275
WEBBER, LLC
5
$100
$183
$306
BALFOUR BEATTY INFRASTRUCTURE, INC.
1
$104
$104
$104
FLUOR HEAVY CIVIL, LLC
1
$109
$109
$109
LARRY YOUNG PAVING, INC.
1
$110
$110
$110
↑ $109 Median price from winning bids
TxDOT public bid tabulations.
This is one bid item. Your letting has dozens.

Send your CSJ and we'll run this for every one.

We email it back within 24 hours. Free, and no account to create.

Pricing on the 8 lettings for Item 400-6005

Each letting shows the engineer's estimate, every bidder's price including the winner, how far each sat from the estimate, and their total bid.

0035-03-047 US 83 OPERATIONAL IMPROVEMEN Quantity 290.00 CY
November 2024 · CSJ 0035-03-047
Engineer's est.3LW CIVIL LLCWONREECE ALBERT, INC.CK NEWBERRY, LLC
Price per CY$250$304$454$475
Line total$72,500$88,044$131,576$137,750
vs. estimate—+21%+81%+90%
Total bid—$14M$17M$15M
US 79 AT LITTLE BRAZOS RIVER - BR Quantity 396.00 CY
November 2024 · CSJ 0204-09-045
Engineer's est.LARRY YOUNG PAVING, INC.WONMORTMARA CONSTRUCTION, INC.TEXAS MATERIALS GROUP, INC.JAMES CONSTRUCTION GROUP, LLCBIG CREEK CONSTRUCTION, LTD.
Price per CY$105$110$150$179$198$200
Line total$41,580$43,560$59,400$70,884$78,285$79,200
vs. estimate—+5%+43%+70%+88%+90%
Total bid—$19M$29M$19M$23M$19M
We clean the data. You set the price.

Every item on your bid, laid out like this.

We email it back within 24 hours. Free, and no account to create.

TxDOT average low bid prices for Item 400-6005

TxDOT's weighted average unit price for this item across 24 months of lettings. A market reference, not a bid price.

Statewide
Weighted average unit price
all bidders
$168
Weighted average low unit price
winning bids only
$130

Frequently asked questions about TxDOT Item 400

What is TxDOT bid item 400-6005?

Item 400-6005 covers Cem Stabil Bkfl under TxDOT Item 400, Excavation and Backfill for Structures.

What should I bid on 400-6005?

The median of 8 winning bids across Texas lettings at 290–17997 CY over 24 months is $109. Where you land depends on your cost and how tight the competition is.

What did contractors actually charge for 400-6005?

Winning bids ranged from $50 to $306 across 9 contractors, with a median of $109.

What is the average low bid price for 400-6005?

$130 statewide, weighted across all winning bids.

What is the weighted average unit price for 400-6005?

$168 statewide, across all bidders, not just winners.

Why is the average different from the median winning bid?

The average includes every bid, winning and losing, weighted by quantity. The median winning bid only counts the price that won each letting.

How does 400-6005 pricing change with quantity?

This page bands results by quantity so different job sizes aren't averaged together. Larger quantities generally price lower per unit.

Which contractors bid 400-6005 most often?

WEBBER, LLC, JAMES CONSTRUCTION GROUP, LLC, BALFOUR BEATTY INFRASTRUCTURE, INC. are among the most frequent bidders on this item in the current window.

What is the lowest price anyone has bid on 400-6005?

$50 per CY, from MC2 CIVIL, LLC.

How much do bids vary on 400-6005?

From $50 to $306 per CY across 9 contractors, before excluding near-zero outliers.

Why do some bids on 400-6005 come in near zero?

A near-zero bid on one item is usually priced below market and recovered elsewhere on the bid. Near-zero bids are excluded from the figures on this page when present.

Does 400-6005 pricing differ by district?

Weighted average unit price is $168 statewide under All counties. Select a county to compare local pricing against the statewide average.

Has 400-6005 pricing gone up or down?

This page reflects the last 24 months of lettings. Check back as new lettings publish; pricing updates on the same schedule as the rest of the bid tabulation tools.

How many TxDOT projects used 400-6005 in the last 24 months?

8 lettings in Texas carried this item in the current window.

How competitive is bidding on 400-6005?

9 contractors bid this item across 8 lettings, with prices spanning $50 to $306 per CY.