TxDOT Bid Item 531-7001 Pricing — Conc Sidewalks (4")

See what winning bidders charged, and which contractors bid this item.
Enter your quantity and county below.

What winning bidders charged for 531-7001

$92
Median price from winning bids (half the winners came in below it)
From 44 Texas lettings at 269–1304 SY over 24 months.

Contractors who bid Item 531-7001

Price at a contractor's lowest and you have beaten them on this item. Price at their median and it is a coin flip. In price range, a short bar means they price this item consistently, a long one means it changes job to job.

Contractor
Bids
Price range
Lowest
Median
Highest
ACME BRIDGE COMPANY, INC.
2
$40
$62
$85
REIM CONSTRUCTION, INC.
1
$44
$44
$44
INTERNATIONAL EAGLE ENTERPRISES, INC.
1
$45
$45
$45
URBAN INFRACONSTRUCTION LLC
3
$48
$108
$120
ISI CONTRACTING, INC.
3
$48
$100
$120
GRANITE CONSTRUCTION COMPANY
1
$50
$50
$50
FOREMOST PAVING, INC.
3
$52
$69
$115
JAMES CONSTRUCTION GROUP, LLC
4
$54
$86
$131
ARTILLERY L.L.C.
2
$54
$72
$90
↑ $92 Median price from winning bids
TxDOT public bid tabulations.
This is one bid item. Your letting has dozens.

Send your CSJ and we'll run this for every one.

We email it back within 24 hours. Free, and no account to create.

Pricing on the 10 lettings closest to 617.5 SY for Item 531-7001

Each letting shows the engineer's estimate, every bidder's price including the winner, how far each sat from the estimate, and their total bid. Selected from 44 lettings in the current filter.

0018-06, IH35 DIRECT CONNECTORS #3#4&#6 Quantity 618.00 SY
June 2026 · CSJ 0018-06-185
Engineer's est.URBAN INFRACONSTRUCTION LLCWONZACHRY CONSTRUCTION CORPORATIONWEBBER, LLCJAMES CONSTRUCTION GROUP, LLCIOC COMPANY LLCWILLIAMS BROTHERS CONSTRUCTION CO., INC.
Price per SY$110$108$76$77$95$95$120
Line total$67,980$66,775$47,024$47,722$58,704$58,710$74,160
vs. estimate—−2%−31%−30%−14%−14%+9%
Total bid—$70M$86M$80M$73M$104M$77M
WF | US 190 | LAMPASAS CL | CLARK RD Quantity 617.00 SY
November 2025 · CSJ 0231-19-003
Engineer's est.JAMES CONSTRUCTION GROUP, LLCWONGRANITE CONSTRUCTION COMPANYINDUS ROAD & BRIDGE, INC.WEBBER, LLCPULICE CONSTRUCTION, INC.ORION CONSTRUCTION, LLCJORDAN FOSTER CONSTRUCTION, LLC
Price per SY$90$54$50$72$85$96$98$100
Line total$55,530$33,096$30,696$44,424$52,599$59,226$60,466$61,700
vs. estimate—−40%−45%−20%−5%+7%+9%+11%
Total bid—$107M$129M$113M$119M$120M$126M$123M
We clean the data. You set the price.

Every item on your bid, laid out like this.

We email it back within 24 hours. Free, and no account to create.

TxDOT average low bid prices for Item 531-7001

TxDOT's weighted average unit price for this item across 24 months of lettings. A market reference, not a bid price.

Statewide
Weighted average unit price
all bidders
$103
Weighted average low unit price
winning bids only
$90

Frequently asked questions about TxDOT Item 531

What is TxDOT bid item 531-7001?

Item 531-7001 covers Conc Sidewalks (4") under TxDOT Item 531, Sidewalks.

What should I bid on 531-7001?

The median winning bid across 44 Texas lettings at 269–1304 SY over 24 months is $92. Where you land depends on your cost and how tight the competition is.

What did contractors actually charge for 531-7001?

Winning bids ranged from $40 to $131 across 9 contractors, with a median of $92.

What is the average low bid price for 531-7001?

$90 statewide, weighted across all winning bids.

What is the weighted average unit price for 531-7001?

$103 statewide, across all bidders, not just winners.

Why is the average different from the median winning bid?

The average includes every bid, winning and losing, weighted by quantity. The median winning bid only counts the price that won each letting.

How does 531-7001 pricing change with quantity?

This page bands results by quantity so different job sizes aren't averaged together. Larger quantities generally price lower per unit.

Which contractors bid 531-7001 most often?

JAMES CONSTRUCTION GROUP, LLC, FOREMOST PAVING, INC., ISI CONTRACTING, INC. are among the most frequent bidders on this item in the current window.

What is the lowest price anyone has bid on 531-7001?

$40 per SY, from ACME BRIDGE COMPANY, INC..

How much do bids vary on 531-7001?

From $40 to $131 per SY across 9 contractors, before excluding near-zero outliers.

Why do some bids on 531-7001 come in near zero?

A near-zero bid on one item is usually priced below market and recovered elsewhere on the bid. Near-zero bids are excluded from the figures on this page when present.

Does 531-7001 pricing differ by district?

Weighted average unit price is $103 statewide under All counties. Select a county to compare local pricing against the statewide average.

Has 531-7001 pricing gone up or down?

This page reflects the last 24 months of lettings. Check back as new lettings publish; pricing updates on the same schedule as the rest of the bid tabulation tools.

How many TxDOT projects used 531-7001 in the last 24 months?

44 lettings in Texas carried this item in the current window.

How competitive is bidding on 531-7001?

9 contractors bid this item across 44 lettings, with prices spanning $40 to $131 per SY.