What winning bidders charged for 620-7008

$2.20
Median price from winning bids (half the winners came in below it)
From 52 Texas lettings at 2500–5686 LF over 24 months.

Contractors who bid Item 620-7008

Price at a contractor's lowest and you have beaten them on this item. Price at their median and it is a coin flip. In price range, a short bar means they price this item consistently, a long one means it changes job to job.

Contractor
Bids
Price range
Lowest
Median
Highest
ICOS MANAGEMENT, LLC
1
$1.10
$1.10
$1.10
SICE, INC.
6
$1.33
$1.42
$2.20
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC
7
$1.40
$2.00
$4.50
COPPELL CONSTRUCTION CO., INC.
1
$1.50
$1.50
$1.50
E-Z BEL CONSTRUCTION, LLC
14
$1.50
$2.20
$5.00
STX CIVIL
6
$1.50
$2.20
$2.63
HUNTER INDUSTRIES, LTD.
10
$1.55
$2.15
$3.53
TEXAS MATERIALS GROUP, INC.
7
$1.55
$2.00
$3.53
TEXAS STEEL INDUSTRIAL PLACING, LLC
2
$1.55
$1.60
$1.65
↑ $2.20 Median price from winning bids
TxDOT public bid tabulations.
This is one bid item. Your letting has dozens.

Send your CSJ and we'll run this for every one.

We email it back within 24 hours. Free, and no account to create.

Pricing on the 10 lettings closest to 4092.5 LF for Item 620-7008

Each letting shows the engineer's estimate, every bidder's price including the winner, how far each sat from the estimate, and their total bid. Selected from 52 lettings in the current filter.

AUS_FM734(HSIP23) Quantity 4090.00 LF
July 2026 · CSJ 3417-02-039
Engineer's est.VACA UNDERGROUND UTILITIES INCWONSICE, INC.E-Z BEL CONSTRUCTION, LLCELECNOR BELCO ELECTRIC, INC.THE LEVY COMPANY, LLCFLORIDA TRAFFIC CONTROL DEVICES, INC.AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC
Price per LF$2.00$2.25$1.57$1.70$1.90$1.91$2.20$3.00
Line total$8,180.00$9,202.50$6,409.03$6,953.00$7,771.00$7,811.90$8,998.00$12,270.00
vs. estimate—+13%−22%−15%−5%−5%+10%+50%
Total bid—$342,220$373,341$398,342$386,823$415,803$488,488$547,400
SL 12 From S of John West to Tillman Quantity 4095.00 LF
May 2025 · CSJ 0581-01-182
Engineer's est.SELECT MAINTENANCE, L.L.C.WONGREY SKY CONSTRUCTION LLCWG ENGINEERING & CONSTRUCTION, LLCDURABLE SPECIALTIES, INC.AMERICAN LIGHTING AND SIGNALIZATION, LLC
Price per LF$3.00$2.00$3.00$3.00$4.00$9.85
Line total$12,285.00$8,190.00$12,285.00$12,285.00$16,380.00$40,335.75
vs. estimate—−33%0%0%+33%+228%
Total bid—$3.1M$3.8M$3.4M$3.8M$4.2M
We clean the data. You set the price.

Every item on your bid, laid out like this.

We email it back within 24 hours. Free, and no account to create.

TxDOT average low bid prices for Item 620-7008

TxDOT's weighted average unit price for this item across 24 months of lettings. A market reference, not a bid price.

Statewide
Weighted average unit price
all bidders
$2.52
Weighted average low unit price
winning bids only
$2.38

Frequently asked questions about TxDOT Item 620

What is TxDOT bid item 620-7008?

Item 620-7008 covers Elec Condr (No.8) Insulated under TxDOT Item 620, Electrical Conductors.

What should I bid on 620-7008?

The median winning bid across 52 Texas lettings at 2500–5686 LF over 24 months is $2.20. Where you land depends on your cost and how tight the competition is.

What did contractors actually charge for 620-7008?

Winning bids ranged from $1.10 to $5.00 across 9 contractors, with a median of $2.20.

What is the average low bid price for 620-7008?

$2.38 statewide, weighted across all winning bids.

What is the weighted average unit price for 620-7008?

$2.52 statewide, across all bidders, not just winners.

Why is the average different from the median winning bid?

The average includes every bid, winning and losing, weighted by quantity. The median winning bid only counts the price that won each letting.

How does 620-7008 pricing change with quantity?

This page bands results by quantity so different job sizes aren't averaged together. Larger quantities generally price lower per unit.

Which contractors bid 620-7008 most often?

E-Z BEL CONSTRUCTION, LLC, HUNTER INDUSTRIES, LTD., AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC are among the most frequent bidders on this item in the current window.

What is the lowest price anyone has bid on 620-7008?

$1.10 per LF, from ICOS MANAGEMENT, LLC.

How much do bids vary on 620-7008?

From $1.10 to $5.00 per LF across 9 contractors, before excluding near-zero outliers.

Why do some bids on 620-7008 come in near zero?

A near-zero bid on one item is usually priced below market and recovered elsewhere on the bid. Near-zero bids are excluded from the figures on this page when present.

Does 620-7008 pricing differ by district?

Weighted average unit price is $2.52 statewide under All counties. Select a county to compare local pricing against the statewide average.

Has 620-7008 pricing gone up or down?

This page reflects the last 24 months of lettings. Check back as new lettings publish; pricing updates on the same schedule as the rest of the bid tabulation tools.

How many TxDOT projects used 620-7008 in the last 24 months?

52 lettings in Texas carried this item in the current window.

How competitive is bidding on 620-7008?

9 contractors bid this item across 52 lettings, with prices spanning $1.10 to $5.00 per LF.