TxDOT bid item 401-7001: FLOWABLE BACKFILL pricing

Across the last 24 months, TxDOT bid item 401-7001 appeared on 317 lettings, priced by 236 different competitors. Start with the average unit price for a quick gut-check, then use the quantity breakdown below to match your project's scale.

Loading company and geography lists…

Location - USA · Texas

Weighted average unit price — price varies by quantity, see the full breakdown below.

$272.69

Weighted average low unit price — winning bids only; price varies by quantity, see the full breakdown below.

$262.55

Bid code

401-7001

Bid item unit

CY

Projects

317

Competitors (Vendors)

236

Analysis window 2024-09-14 to 2026-09-14 · 24 months

Projects (Top 5)

BPM North FY 27

CSJ: 6501-05-001Let date: 2026-09-03

BLACKSMITH VENTURES LLCROY JORGENSEN ASSOCIATES, INC.SCOTT TUCKER CONSTRUCTION COMPANY, LLCTHE TRUESDELL CORPORATION
Bid item qtyBid item priceBid item qtyBid item priceBid item qtyBid item priceBid item qtyBid item price
10.00$700.0010.00$200.0010.00$681.0010.00$555.00

Want this comparison built automatically for every item on your next bid?Request POC access

Drainage Improvements FM2480

CSJ: 6502-56-001Let date: 2026-09-02

DIGG COMMERCIAL, LLC
Bid item qtyBid item price
251.00$50.00

Want this comparison built automatically for every item on your next bid?Request POC access

BPM- Districtwide

CSJ: 6506-40-001Let date: 2026-08-20

GARRET SHIELDS INFRASTRUCTURESTRUCTURAL INTEGRITY GROUP LLCPREMIER CONTRACTORS LLCBLACKSMITH VENTURES LLCCROSS PLUS CONSTRUCTION, LLC
Bid item qtyBid item priceBid item qtyBid item priceBid item qtyBid item priceBid item qtyBid item priceBid item qtyBid item price
15.00$300.0015.00$354.0015.00$400.0015.00$1,000.0015.00$1,100.00

Want this comparison built automatically for every item on your next bid?Request POC access

FY27 - District Cross Drainage -08

CSJ: 6504-47-001Let date: 2026-08-12

GARRET SHIELDS INFRASTRUCTURECROSS PLUS CONSTRUCTION, LLCDIGG COMMERCIAL, LLCCEDAR HILL SERVICES, LLC
Bid item qtyBid item priceBid item qtyBid item priceBid item qtyBid item priceBid item qtyBid item price
50.00$200.0050.00$400.0050.00$300.0050.00$480.00

Want this comparison built automatically for every item on your next bid?Request POC access

Interchange@Uniroyal Dr&SH 84

CSJ: 0018-05-089Let date: 2026-08-06

PULICE CONSTRUCTION, INC.JAMES CONSTRUCTION GROUP, LLC
Bid item qtyBid item priceBid item qtyBid item price
903.00$200.00903.00$248.71

Want this comparison built automatically for every item on your next bid?Request POC access

Insights on bid item 401-7001 pricing on TxDOT bids - include across "317" lettings

Two competitors on this item, BK FIELD OPERATIONS LLC and DIAMOND R CONTRACTING, LLC, have both bid as low as $1.00 per unit, well below the $272.69 quantity-weighted average across all 317 lettings. A gap that size on a pay item is a common sign of an unbalanced bid, cost shifted onto a different pay item rather than priced here directly.

Frequently asked questions on TxDOT bid item code 401-7001

What is TxDOT bid item 401-7001?
TxDOT bid item 401-7001 is the pay item "FLOWABLE BACKFILL". Contractors bid a unit price on this item in TxDOT lettings; this page shows those historical competitor (vendor) unit prices.
How do I price bid item 401-7001 for my next TxDOT bid?
Start with the average unit price for 401-7001 (FLOWABLE BACKFILL) of $272.69 as a gut-check, then match a similar quantity band and district or county and use the competitor price range in that band as your final benchmark.
What's included in the 401-7001 unit price?
Measurement" will be paid for at the unit price bid for "Flowable Backfill." This price is full compensation for furnishing, hauling, and placing materials and for equipment, tools, labor, and incidentals.
Why do unit prices for 401-7001 vary across competitors?
Unit price for FLOWABLE BACKFILL scales with bid quantity, district labor and material costs, and project conditions. The average ($272.69) shows the market level for 401-7001; comparing prices within the same quantity group keeps the benchmark realistic for your bid size.
Why did BK FIELD OPERATIONS LLC bid $1.00 on this item?
A bid that low usually isn't the market price, it's a signal the contractor priced this item at or near zero and recovered the cost elsewhere in the bid, a strategy called unbalanced bidding. Worth excluding outliers like this when using the average as your own benchmark.
How many TxDOT projects used bid item 401-7001 in the last 24 months?
In the default 24-month window, bid item 401-7001 (FLOWABLE BACKFILL) appeared on 317 lettings priced by 236 different competitors (vendors). Counts update when you change the analysis window or filters.
What is TxDOT Item 401, Flowable Backfill?
Furnish and place flowable backfill for trench, hole, or other void.
Is pricing data for bid item 401-7001 public?
Yes. TxDOT publishes bid tabulations after each letting, including every competitor's unit price on 401-7001. This page structures that public record for FLOWABLE BACKFILL so you can compare without opening each letting by hand.