TxDOT bid item 624-7008: GROUND BOX TY D (162922)W/APRON pricing
Across the last 24 months, TxDOT bid item 624-7008 appeared on 251 lettings, priced by 201 different competitors. Start with the average unit price for a quick gut-check, then use the quantity breakdown below to match your project's scale.
Loading company and geography lists…
Weighted average unit price — price varies by quantity, see the full breakdown below.
$1,761.65
Weighted average low unit price — winning bids only; price varies by quantity, see the full breakdown below.
$1,692.59
Bid code
624-7008
Bid item unit
EA
Projects
251
Competitors (Vendors)
201
Projects (Top 5)
FY 2027:Non-site Specific Traf Signals
CSJ: 0918-00-440Let date: 2026-09-03
| ELECNOR BELCO ELECTRIC, INC. | WG ENGINEERING & CONSTRUCTION, LLC | YUNEX LLC | DURABLE SPECIALTIES, INC. | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | |||||
|---|---|---|---|---|---|---|---|---|---|
| Bid item qty | Bid item price | Bid item qty | Bid item price | Bid item qty | Bid item price | Bid item qty | Bid item price | Bid item qty | Bid item price |
| 4.00 | $2,139.00 | 4.00 | $1,850.00 | 4.00 | $2,285.00 | 4.00 | $2,900.00 | 4.00 | $1,920.00 |
Want this comparison built automatically for every item on your next bid? → Request POC access
SL 1604: 1479-01-028: SFT
CSJ: 1479-01-028Let date: 2026-09-03
| HUNTER INDUSTRIES, LTD. | DAN WILLIAMS COMPANY | ||
|---|---|---|---|
| Bid item qty | Bid item price | Bid item qty | Bid item price |
| 1.00 | $1,241.00 | 1.00 | $1,250.00 |
Want this comparison built automatically for every item on your next bid? → Request POC access
150501016 FM 1575 CAMERON (REHAB)
CSJ: 1505-01-016Let date: 2026-09-03
| FOREMOST PAVING, INC. | TEXAS CORDIA CONSTRUCTION, LLC | REIM CONSTRUCTION, INC. | |||
|---|---|---|---|---|---|
| Bid item qty | Bid item price | Bid item qty | Bid item price | Bid item qty | Bid item price |
| 1.00 | $1,809.00 | 1.00 | $2,030.00 | 1.00 | $1,970.00 |
Want this comparison built automatically for every item on your next bid? → Request POC access
SH 121 Intersection Improvements 2
CSJ: 0549-02-038Let date: 2026-09-02
| TEXAS MATERIALS GROUP, INC. | JAGOE-PUBLIC COMPANY | HIGHWAY 19 CONSTRUCTION LLC | A. K. GILLIS & SONS, LLC | ||||
|---|---|---|---|---|---|---|---|
| Bid item qty | Bid item price | Bid item qty | Bid item price | Bid item qty | Bid item price | Bid item qty | Bid item price |
| 9.00 | $1,586.00 | 9.00 | $1,400.00 | 9.00 | $1,500.00 | 9.00 | $1,400.00 |
Want this comparison built automatically for every item on your next bid? → Request POC access
PHR_SH495_FY24
CSJ: 0865-01-118Let date: 2026-09-02
| TRAF-TEX, INC. | THE LEVY COMPANY, LLC | TEXAS CORDIA CONSTRUCTION, LLC | CASTILLO ARANDA LLC | ||||
|---|---|---|---|---|---|---|---|
| Bid item qty | Bid item price | Bid item qty | Bid item price | Bid item qty | Bid item price | Bid item qty | Bid item price |
| 4.00 | $1,201.00 | 4.00 | $1,995.00 | 4.00 | $2,069.00 | 4.00 | $1,650.00 |
Want this comparison built automatically for every item on your next bid? → Request POC access
Insights on bid item 624-7008 pricing on TxDOT bids - include across "251" lettings
One competitor on this item, MBN ENTERPRISES LLC, has bid as low as $5.00 per unit, well below the $1,761.65 quantity-weighted average across all 251 lettings. A gap that size on a pay item is a common sign of an unbalanced bid, cost shifted onto a different pay item rather than priced here directly.
Frequently asked questions on TxDOT bid item code 624-7008
- What is TxDOT bid item 624-7008?
- TxDOT bid item 624-7008 is the pay item "GROUND BOX TY D (162922)W/APRON". Contractors bid a unit price on this item in TxDOT lettings; this page shows those historical competitor (vendor) unit prices.
- How do I price bid item 624-7008 for my next TxDOT bid?
- Start with the average unit price for 624-7008 (GROUND BOX TY D (162922)W/APRON) of $1,761.65 as a gut-check, then match a similar quantity band and district or county and use the competitor price range in that band as your final benchmark.
- What's included in the 624-7008 unit price?
- Measurement" will be paid for at the unit price bid for "Ground Box" of the types and sizes specified and for "Remove Ground Box." 5.1. Installation. This price is full compensation for excavating, backfilling, and aggregate; constructing, furnishing, and installing ground boxes and concrete aprons; and material, equipment, labor, tools, and incidentals.
- Why do unit prices for 624-7008 vary across competitors?
- Unit price for GROUND BOX TY D (162922)W/APRON scales with bid quantity, district labor and material costs, and project conditions. The average ($1,761.65) shows the market level for 624-7008; comparing prices within the same quantity group keeps the benchmark realistic for your bid size.
- Why did MBN ENTERPRISES LLC bid $5.00 on this item?
- A bid that low usually isn't the market price, it's a signal the contractor priced this item at or near zero and recovered the cost elsewhere in the bid, a strategy called unbalanced bidding. Worth excluding outliers like this when using the average as your own benchmark.
- How many TxDOT projects used bid item 624-7008 in the last 24 months?
- In the default 24-month window, bid item 624-7008 (GROUND BOX TY D (162922)W/APRON) appeared on 251 lettings priced by 201 different competitors (vendors). Counts update when you change the analysis window or filters.
- What is TxDOT Item 624, Ground Boxes?
- 1.1. Installation. Construct, furnish, and install ground boxes complete with lids. 1.2. Removal. Remove existing ground boxes.
- Is pricing data for bid item 624-7008 public?
- Yes. TxDOT publishes bid tabulations after each letting, including every competitor's unit price on 624-7008. This page structures that public record for GROUND BOX TY D (162922)W/APRON so you can compare without opening each letting by hand.