What winning bidders charged for 544-7003

$300
Median price from winning bids (half the winners came in below it)
From 131 Texas lettings at 4–6 EA over 24 months.

Contractors who bid Item 544-7003

Price at a contractor's lowest and you have beaten them on this item. Price at their median and it is a coin flip. In price range, a short bar means they price this item consistently, a long one means it changes job to job.

Contractor
Bids
Price range
Lowest
Median
Highest
E-Z BEL CONSTRUCTION, LLC
12
$30
$325
$1,100
ISI CONTRACTING, INC.
10
$34
$401
$1,439
AUSTIN BARRICADE COMPANY, L.L.C.
4
$100
$325
$800
COPPELL CONSTRUCTION CO., INC.
3
$100
$200
$400
CROSS PLUS CONSTRUCTION, LLC
1
$100
$100
$100
DREWERY CONSTRUCTION COMPANY, INCORPORATED
3
$100
$215
$600
GILVIN-TERRILL, LTD.
10
$100
$300
$1,000
HJC FARMS, INC.
1
$100
$100
$100
RHINO EQUITY, LLC
1
$100
$100
$100
↑ $300 Median price from winning bids
TxDOT public bid tabulations.
This is one bid item. Your letting has dozens.

Send your CSJ and we'll run this for every one.

We email it back within 24 hours. Free, and no account to create.

Pricing on the 10 lettings closest to 5 EA for Item 544-7003

Each letting shows the engineer's estimate, every bidder's price including the winner, how far each sat from the estimate, and their total bid. Selected from 131 lettings in the current filter.

FY26 - Bryan AO MBGF -08 Quantity 5.00 EA, same as yours
August 2026 · CSJ 6505-53-001
Engineer's est.RHINO EQUITY, LLCWON ⚠T&L CLEANING SERVICES LLC ⚠
Price per EA$260$1 ⚠$1 ⚠
Line total$1,300$5 ⚠$5 ⚠
vs. estimate—−100%−100%
Total bid—$264,125$264,615
FY26 - Brenham AO MBGF -08 Quantity 5.00 EA, same as yours
August 2026 · CSJ 6505-18-001
Engineer's est.T&L CLEANING SERVICES LLCWON ⚠RHINO EQUITY, LLC ⚠
Price per EA$260$1 ⚠$1 ⚠
Line total$1,300$5 ⚠$5 ⚠
vs. estimate—−100%−100%
Total bid—$268,455$294,895
We clean the data. You set the price.

Every item on your bid, laid out like this.

We email it back within 24 hours. Free, and no account to create.

TxDOT average low bid prices for Item 544-7003

TxDOT's weighted average unit price for this item across 24 months of lettings. A market reference, not a bid price.

Statewide
Weighted average unit price
all bidders
$411
Weighted average low unit price
winning bids only
$379

Frequently asked questions about TxDOT Item 544

What is TxDOT bid item 544-7003?

Item 544-7003 covers Guardrail End Treatment (Remove) under TxDOT Item 544, Guardrail End Treatments.

What should I bid on 544-7003?

The median winning bid across 131 Texas lettings at 4–6 EA over 24 months is $300. Where you land depends on your cost and how tight the competition is.

What did contractors actually charge for 544-7003?

Winning bids ranged from $30 to $1,439 across 9 contractors, with a median of $300.

What is the average low bid price for 544-7003?

$379 statewide, weighted across all winning bids.

What is the weighted average unit price for 544-7003?

$411 statewide, across all bidders, not just winners.

Why is the average different from the median winning bid?

The average includes every bid, winning and losing, weighted by quantity. The median winning bid only counts the price that won each letting.

How does 544-7003 pricing change with quantity?

This page bands results by quantity so different job sizes aren't averaged together. Larger quantities generally price lower per unit.

Which contractors bid 544-7003 most often?

E-Z BEL CONSTRUCTION, LLC, GILVIN-TERRILL, LTD., ISI CONTRACTING, INC. are among the most frequent bidders on this item in the current window.

What is the lowest price anyone has bid on 544-7003?

$30 per EA, from E-Z BEL CONSTRUCTION, LLC.

How much do bids vary on 544-7003?

From $30 to $1,439 per EA across 9 contractors, before excluding near-zero outliers.

Why do some bids on 544-7003 come in near zero?

A near-zero bid on one item is usually priced below market and recovered elsewhere on the bid. 38 such bids are excluded from every figure on this page.

Does 544-7003 pricing differ by district?

Weighted average unit price is $411 statewide under All counties. Select a county to compare local pricing against the statewide average.

Has 544-7003 pricing gone up or down?

This page reflects the last 24 months of lettings. Check back as new lettings publish; pricing updates on the same schedule as the rest of the bid tabulation tools.

How many TxDOT projects used 544-7003 in the last 24 months?

131 lettings in Texas carried this item in the current window.

How competitive is bidding on 544-7003?

9 contractors bid this item across 131 lettings, with prices spanning $30 to $1,439 per EA.