TxDOT Bid Item 432-7043 Pricing — Riprap (Stone Protection)(18 In)

See what winning bidders charged, and which contractors bid this item.
Enter your quantity and county below.

What winning bidders charged for 432-7043

$204
Median price from winning bids (half the winners came in below it)
From 48 Texas lettings at 279–536 CY over 24 months.

Contractors who bid Item 432-7043

Price at a contractor's lowest and you have beaten them on this item. Price at their median and it is a coin flip. In price range, a short bar means they price this item consistently, a long one means it changes job to job.

Contractor
Bids
Price range
Lowest
Median
Highest
BAKER & COMPANY CONSTRUCTION, LLC
3
$89
$101
$221
C. E. BARKER, LTD.
4
$92
$234
$368
TI-ZACK CONCRETE, LLC
1
$109
$109
$109
DAN WILLIAMS COMPANY
2
$110
$155
$200
GARRET SHIELDS INFRASTRUCTURE
14
$125
$225
$350
HUNTER INDUSTRIES, LTD.
5
$125
$167
$269
CHAMPION SITE PREP, INC.
1
$130
$130
$130
IOC COMPANY LLC
3
$130
$140
$325
STRUCTURAL INTEGRITY GROUP LLC
6
$130
$285
$340
↑ $204 Median price from winning bids
TxDOT public bid tabulations.
This is one bid item. Your letting has dozens.

Send your CSJ and we'll run this for every one.

We email it back within 24 hours. Free, and no account to create.

Pricing on the 10 lettings closest to 352 CY for Item 432-7043

Each letting shows the engineer's estimate, every bidder's price including the winner, how far each sat from the estimate, and their total bid. Selected from 48 lettings in the current filter.

FM 273 FDR w/Overlay Quantity 352.00 CY, same as yours
October 2026 · CSJ 0510-06-024
Engineer's est.A. K. GILLIS & SONS, LLCWONAUSTIN BRIDGE & ROAD SERVICES, LPTHK CONSTRUCTION LLCOVERLAND CORPORATIOND. L. LENNON INCORPORATED - CONTRACTORJAGOE-PUBLIC COMPANY
Price per CY$180$266$183$225$275$300$360
Line total$63,360$93,481$64,416$79,200$96,800$105,600$126,720
vs. estimate—+48%+2%+25%+53%+67%+100%
Total bid—$9.8M$14M$18M$12M$10.0M$13M
FY26 BPM Quantity 352.00 CY, same as yours
September 2025 · CSJ 6356-68-001
Engineer's est.RHINO EQUITY, LLCWONICOS MANAGEMENT, LLCARTILLERY L.L.C.LUCANIA CONTRACTORS LLCCK NEWBERRY, LLC
Price per CY$230$240$225$300$310$350
Line total$80,960$84,480$79,200$105,600$109,120$123,200
vs. estimate—+4%−2%+30%+35%+52%
Total bid—$487,387$585,214$839,315$756,455$783,650
We clean the data. You set the price.

Every item on your bid, laid out like this.

We email it back within 24 hours. Free, and no account to create.

TxDOT average low bid prices for Item 432-7043

TxDOT's weighted average unit price for this item across 24 months of lettings. A market reference, not a bid price.

Statewide
Weighted average unit price
all bidders
$236
Weighted average low unit price
winning bids only
$215

Frequently asked questions about TxDOT Item 432

What is TxDOT bid item 432-7043?

Item 432-7043 covers Riprap (Stone Protection)(18 In) under TxDOT Item 432, Riprap.

What should I bid on 432-7043?

The median winning bid across 48 Texas lettings at 279–536 CY over 24 months is $204. Where you land depends on your cost and how tight the competition is.

What did contractors actually charge for 432-7043?

Winning bids ranged from $89 to $368 across 9 contractors, with a median of $204.

What is the average low bid price for 432-7043?

$215 statewide, weighted across all winning bids.

What is the weighted average unit price for 432-7043?

$236 statewide, across all bidders, not just winners.

Why is the average different from the median winning bid?

The average includes every bid, winning and losing, weighted by quantity. The median winning bid only counts the price that won each letting.

How does 432-7043 pricing change with quantity?

This page bands results by quantity so different job sizes aren't averaged together. Larger quantities generally price lower per unit.

Which contractors bid 432-7043 most often?

GARRET SHIELDS INFRASTRUCTURE, STRUCTURAL INTEGRITY GROUP LLC, HUNTER INDUSTRIES, LTD. are among the most frequent bidders on this item in the current window.

What is the lowest price anyone has bid on 432-7043?

$89 per CY, from BAKER & COMPANY CONSTRUCTION, LLC.

How much do bids vary on 432-7043?

From $89 to $368 per CY across 9 contractors, before excluding near-zero outliers.

Why do some bids on 432-7043 come in near zero?

A near-zero bid on one item is usually priced below market and recovered elsewhere on the bid. Near-zero bids are excluded from the figures on this page when present.

Does 432-7043 pricing differ by district?

Weighted average unit price is $236 statewide under All counties. Select a county to compare local pricing against the statewide average.

Has 432-7043 pricing gone up or down?

This page reflects the last 24 months of lettings. Check back as new lettings publish; pricing updates on the same schedule as the rest of the bid tabulation tools.

How many TxDOT projects used 432-7043 in the last 24 months?

48 lettings in Texas carried this item in the current window.

How competitive is bidding on 432-7043?

9 contractors bid this item across 48 lettings, with prices spanning $89 to $368 per CY.