What winning bidders charged for 467-7308

$1,300
Median price from winning bids (half the winners came in below it)
From 54 Texas lettings at 8–24 EA over 24 months.

Contractors who bid Item 467-7308

Price at a contractor's lowest and you have beaten them on this item. Price at their median and it is a coin flip. In price range, a short bar means they price this item consistently, a long one means it changes job to job.

Contractor
Bids
Price range
Lowest
Median
Highest
OVERLAND CORPORATION
3
$672
$1,200
$1,770
FOUTSCO PAVING COMPANY, LLC
5
$675
$1,770
$2,500
ED BELL CONSTRUCTION COMPANY
9
$700
$1,100
$1,800
EAST TEXAS BRIDGE, INC.
6
$750
$925
$1,000
H. V. CAVER, INC.
2
$770
$783
$795
HIGHWAY 19 CONSTRUCTION LLC
5
$786
$995
$1,150
H. H. HOWARD & SONS, INC.
2
$850
$875
$900
SAMMY GIST ENTERPRISES, INC.
1
$850
$850
$850
TALBERT COMPANIES LLC
2
$864
$945
$1,026
↑ $1,300 Median price from winning bids
TxDOT public bid tabulations.
This is one bid item. Your letting has dozens.

Send your CSJ and we'll run this for every one.

We email it back within 24 hours. Free, and no account to create.

Pricing on the 10 lettings closest to 12 EA for Item 467-7308

Each letting shows the engineer's estimate, every bidder's price including the winner, how far each sat from the estimate, and their total bid. Selected from 54 lettings in the current filter.

FM 943-(S/POLK C/L-FM1003)BASE REPAIR,OV Quantity 12.00 EA, same as yours
July 2026 · CSJ 1194-02-020
Engineer's est.DURWOOD GREENE CONSTRUCTION CO.WONHAYDEN PAVING, INC.TEXAS MATERIALS GROUP, INC.
Price per EA$1,050$1,400$1,000$1,200
Line total$12,600$16,800$12,000$14,400
vs. estimate—+33%−5%+14%
Total bid—$7.0M$8.2M$7.2M
FM 428 W FM 2931 to E FM 2931 Quantity 12.00 EA, same as yours
January 2026 · CSJ 0817-01-035
Engineer's est.QUALITY EXCAVATION, LLCWONTEXAS MATERIALS GROUP, INC.ED BELL CONSTRUCTION COMPANYGREY SKY CONSTRUCTION LLCJAGOE-PUBLIC COMPANY
Price per EA$1,300$1,057$1,000$1,200$1,250$2,100
Line total$15,600$12,684$12,000$14,400$15,000$25,200
vs. estimate—−19%−23%−8%−4%+62%
Total bid—$1.5M$2.5M$2.0M$1.6M$2.1M
We clean the data. You set the price.

Every item on your bid, laid out like this.

We email it back within 24 hours. Free, and no account to create.

TxDOT average low bid prices for Item 467-7308

TxDOT's weighted average unit price for this item across 24 months of lettings. A market reference, not a bid price.

Statewide
Weighted average unit price
all bidders
$1,672
Weighted average low unit price
winning bids only
$1,525

Frequently asked questions about TxDOT Item 467

What is TxDOT bid item 467-7308?

Item 467-7308 covers Set (Ty Ii) (18 in) (Rcp) (6: 1) (P) under TxDOT Item 467, Safety End Treatment.

What should I bid on 467-7308?

The median winning bid across 54 Texas lettings at 8–24 EA over 24 months is $1,300. Where you land depends on your cost and how tight the competition is.

What did contractors actually charge for 467-7308?

Winning bids ranged from $672 to $2,500 across 9 contractors, with a median of $1,300.

What is the average low bid price for 467-7308?

$1,525 statewide, weighted across all winning bids.

What is the weighted average unit price for 467-7308?

$1,672 statewide, across all bidders, not just winners.

Why is the average different from the median winning bid?

The average includes every bid, winning and losing, weighted by quantity. The median winning bid only counts the price that won each letting.

How does 467-7308 pricing change with quantity?

This page bands results by quantity so different job sizes aren't averaged together. Larger quantities generally price lower per unit.

Which contractors bid 467-7308 most often?

ED BELL CONSTRUCTION COMPANY, EAST TEXAS BRIDGE, INC., FOUTSCO PAVING COMPANY, LLC are among the most frequent bidders on this item in the current window.

What is the lowest price anyone has bid on 467-7308?

$672 per EA, from OVERLAND CORPORATION.

How much do bids vary on 467-7308?

From $672 to $2,500 per EA across 9 contractors, before excluding near-zero outliers.

Why do some bids on 467-7308 come in near zero?

A near-zero bid on one item is usually priced below market and recovered elsewhere on the bid. Near-zero bids are excluded from the figures on this page when present.

Does 467-7308 pricing differ by district?

Weighted average unit price is $1,672 statewide under All counties. Select a county to compare local pricing against the statewide average.

Has 467-7308 pricing gone up or down?

This page reflects the last 24 months of lettings. Check back as new lettings publish; pricing updates on the same schedule as the rest of the bid tabulation tools.

How many TxDOT projects used 467-7308 in the last 24 months?

54 lettings in Texas carried this item in the current window.

How competitive is bidding on 467-7308?

9 contractors bid this item across 54 lettings, with prices spanning $672 to $2,500 per EA.