Pick a project
Any real TxDOT project, by name or CSJ
Select a real TxDOT project by name or CSJ.
One TxDOT bid package
Estimated Quantity, as published
132-7005 · Embankment
Takeoff Quantity, calculated
132-7005 · Embankment
Status
TxDOT publishes an Engineer's Estimate with every bid package. It's official, current, and not independently checked against the plans. Clarement reads the full bid package, drawings, general notes, and special provisions, and calculates its own quantity for every listed bid item, so you're working from a verified number instead of a published one.
Published, not verified
The Engineer's Estimate is TxDOT's own reference figure, published with every bid package. It's official and current, but it isn't independently re-derived from the drawings and special provisions as a routine check, it's the number as prepared. Confirming it actually matches what the plans call for is left to whoever's pricing the bid.
Estimated Quantity, as published
132-7005 · Embankment
One number, no comparison
132-7005 · Embankment
One number, no context
A bid item's listed quantity is just a number. It carries no signal about whether it matches what's actually shown in the drawings, that only becomes visible if someone does the independent calculation and compares the two. Without that second number, there's nothing to check the first one against.
Found after the fact
When an Engineer's Estimate quantity is wrong, it typically doesn't get caught until execution, when a measured quantity in the field doesn't match what was priced. By then it's a field problem and a margin problem, not a five-minute fix before the letting.
260-7001 · Lime Treatment
Takeoff Quantity
1,240 SY
Estimated Quantity
12,400 SY
Any real TxDOT project, by name or CSJ
Select a real TxDOT project by name or CSJ.
Drawings, notes, and provisions, together
The full bid package gets read, drawings, general notes, special provisions, and an independent quantity gets calculated for every listed bid item.
Matched, Mismatched, or Not Processed
Each calculated quantity is checked against TxDOT's Engineer's Estimate and marked Matched, Mismatched, or Not Processed.
You're pricing against the Engineer's Estimate whether or not you've had time to verify it. This gives you that check without adding a manual takeoff step to every single bid item.
Takeoff 1,240 SY vs Estimated 12,400 SY.
Verified, not assumed
Field cost problems tied to a bad Engineer's Estimate are easier to manage when you know about them at award, not when a measured quantity in the field stops matching what was priced.
Status breakdown
108
Matched
113
Mismatched
183
Not Processed
Known at award
Whether a bid was priced against verified numbers is a real input into how confident you should be in that bid, not something you find out after the fact.
Bid items · full package
108 matched · 113 mismatched · 183 not processed.
Every item, accounted for
A quantity takeoff is the measurement work behind every bid item: reading drawings, notes, and special provisions to figure out how much of something a project actually needs, then checking that number before you price against it.
The Engineer's Estimate is TxDOT's number, published with the bid package as a reference point. This calculates its own quantity independently from the same drawings and notes, then checks it against TxDOT's figure, so you're not just trusting the published number, you're verifying it.
No. Those are where you do a full manual takeoff and build your estimate. This is a check that runs before or alongside that work, confirming whether the Engineer's Estimate itself holds up, which is the one number none of those tools verify for you.
Today, this checks bid-item-level quantities, the same numbers listed in the Engineer's Estimate, against what the bid package supports. Deeper sub-item detail, forming area, steel weight, painting area within a structure, is a different, harder layer of takeoff that still needs to be done by hand for now.
It's a real, if uncommon, failure mode. A unit can be entered wrong, square feet where it should read square yards, which can throw a quantity off by a factor of ten. Catching that before bid day is the difference between pricing accurately and pricing blind.
Bid code and description, the unit of measure, the calculated Takeoff Quantity, TxDOT's Estimated Quantity for that same item, the Quantity Variance between the two, and a Status showing whether it's Matched, Mismatched, or Not Processed, everything needed to decide whether an item is worth a closer look without leaving the results.
Right now this runs on TxDOT projects. More state DOT projects are planned, so the same approach will extend to heavy civil highway and road work beyond Texas as those are added.
No. Select a project and run the comparison, no sign-up required.
Yes. This tool, and the projects loaded into it, are free to use, no account required.
Yes. Bid Item Pricing, Win Margin Analysis, and Loss Gap Analysis cover competitor pricing and margin patterns from real TxDOT lettings, and the Contract Risk Register covers contract and execution risk, both free, both no account required.
Pick a real TxDOT project, run the comparison, and see exactly which bid items match TxDOT's Engineer's Estimate, which don't, and which still need a manual look.